All In One Pro PAT Testing
All In One Pro PAT Testing
Table Of Contents

A Facilities Manager’s Guide to UK Electrical Compliance Deadlines

PAT Testing 13a Plug

Staying on top of electrical compliance can feel like spinning plates—EICRs, PAT testing, fire alarms, emergency lighting, RCD checks, lightning protection and EV chargers all have different cycles. This guide pulls everything into one place with clear, risk‑based timelines you can tailor to your site, plus planning tips to reduce disruption and cost.

All In One Pro PAT Testing is a specialist portable appliance testing provider. We work with facilities teams across offices, retail, hospitality, education, healthcare and construction to keep appliances safe and records audit‑ready—and we coordinate with your fixed‑wire (EICR) contractor to help you close actions quickly.

Need routine appliance testing? See our PAT Testing page: https://allinonepropat.co.uk/pat-testing/

Quick‑reference compliance calendar (what to do and when)

AreaWhat you must doTypical frequencyStandard / guidanceEvidence to keep
Fixed wiring (EICR)Periodic inspection & testing of fixed installationRisk‑based. Commonly 5 years (offices/retail), 3 years (industrial), 5 years PRS rentals (legal in England/Scotland/Wales), shorter for special locationsBS 7671; Electricity at Work Regs 1989EICR and any remedial completion certificates
PAT testingInspection & testing of portable/transportable equipmentRisk‑based. E.g., offices 12–24 months; kitchens 6–12 months; construction 3 monthsHSE guidance; IET Code of PracticePAT certificates, asset register, fail reports
Fire alarm systems (non‑domestic)User weekly test; competent service at set intervalsWeekly user test; 6‑monthly service (some sites quarterly); daily visual checks by staffBS 5839‑1Fire alarm logbook; service reports
Emergency lightingFunctional test; full duration test; maintenanceMonthly functional test; annual 3‑hour duration testBS 5266‑1Emergency lighting logbook; annual test certificate
RCDs (fixed)Functional test using test button; periodic verificationTypically every 6 months by user (or as manufacturer labels); electrical verification during EICRManufacturer’s instructions; BS 7671RCD test records/logs; EICR results
Lightning protection (if fitted)Inspection & testing of LPS and earth resistanceAt least annually; shorter intervals for high risk/sites near the coast; after significant alterations or strikesBS EN 62305LPS test reports; maintenance records
EV charge points (if fitted)Periodic inspection & testing; firmware/safety checksCommonly annual inspection; 6‑monthly user visual checksIET Code of Practice for EV Charging EquipmentInspection report; EVCP maintenance logs
Thermal imaging (best practice)Thermographic survey of distribution boards/MCCsAnnually in higher‑load/critical sites; after major changesInsurer/engineering best practiceThermography report; remedial actions

Note: Frequencies are guidance, not one‑size‑fits‑all. Your risk assessment, usage, environment, manufacturer instructions, and insurer requirements take precedence.

EICR frequency by environment (typical practice)

EnvironmentTypical intervalNotes
Offices / Admin buildingsEvery 5 yearsMay shorten if history of defects or heavy alteration
Retail units / ShopsEvery 5 yearsConsider 3 years for high footfall/public access
Industrial / Workshops / ManufacturingEvery 3 yearsHarsher conditions justify shorter cycles
Hospitality (Hotels, Restaurants, Bars)Every 5 yearsWet areas/catering may prompt more frequent checks
Education (Schools, Colleges)Every 5 yearsTermly visual checks often adopted as good practice
Places of public entertainmentEvery 1 yearHigher public risk; often insurer‑driven
Swimming pools / Spa areasEvery 1 yearSpecial location per BS 7671
Agricultural / HorticulturalEvery 3 yearsDamp/corrosive atmospheres
Construction site temporary installationsEvery 3 monthsFrequent changes; harsh environment
Private rented homes (PRS)Every 5 yearsLegal duty in England, Scotland and Wales; local variations apply
HMOsEvery 5 yearsOften explicit in licensing conditions
Caravan parks / MarinasEvery 1 yearOutdoor/wet environments

Important: BS 7671 requires intervals to be determined by the competent person based on risk and condition. Treat the table above as common practice, not a substitute for professional judgement.

PAT testing: risk‑based intervals (with examples)

What the law says

There’s no fixed legal timeframe for PAT testing. The law requires electrical equipment to be maintained so as not to give rise to danger (Electricity at Work Regulations 1989). HSE and the IET recommend a risk‑based regime considering environment, usage, and equipment type.

Environment / equipmentUser visual checksFormal visualCombined inspection & testNotes
Low‑risk office IT (PCs, monitors)At use / housekeeping12 months24–48 monthsLower physical stress; keep leads tidy
Office extension leads / multiway blocksAt use6 months12 monthsCommon failure point; don’t overload
Kitchens / catering (kettles, microwaves)Daily/at use6 months6–12 monthsHeat, moisture and frequent movement
Workshops / maintenance toolsBefore use3 months6–12 monthsRough handling; trailing leads
Construction site 110V tools/leadsBefore useMonthly3 monthsHarsh environment; insurer‑driven
Portable RCD adaptersPush‑button before use6 months12 monthsReplace if test fails
Fixed appliances (FAT) – e.g., hand dryersMonthly walk‑by12 monthsRisk‑based / align with EICROften tested as part of planned maintenance

Internal link: Book risk‑based PAT with clear pass/fail reporting: https://allinonepropat.co.uk/pat-testing/

Plan like a pro: a simple year‑planner

  • Weekly
    • Test the fire alarm (rotate call points); record in the logbook.
  • Monthly
    • Emergency lighting functional test; note any failures and repair promptly.
    • Walk‑through visual checks of sockets, plugs, leads and portable RCDs.
  • Quarterly
    • Formal visual inspections for higher‑risk appliances/leads.
    • RCD push‑button tests if your equipment labels specify quarterly.
  • 6‑monthly
    • Fire alarm service by a competent contractor.
  • Annually
    • Emergency lighting 3‑hour duration test.
    • Lightning protection inspection (if installed).
    • PAT for moderate‑risk areas; thermography for critical boards.
  • 3 years
    • Typical EICR for industrial/workshop environments.
  • 5 years
    • Typical EICR for offices/retail/hospitality and PRS landlord checks.

Tip: Bundle visits. Many FMs align PAT for kitchens/workshops with the fire alarm 6‑monthly service, and schedule office PAT alongside the annual emergency lighting duration test to reduce downtime and access costs.

Documentation to keep audit‑ready

  • Latest EICR, previous EICRs and all remedial/variation certificates
  • PAT certificates, asset register, failed item reports, and re‑test records
  • Fire alarm and emergency lighting logbooks and service reports
  • RCD push‑button and functional test logs (where maintained)
  • Lightning protection test certificates (if fitted)
  • Risk assessments, method statements and any circuit schedules/drawings

Common pitfalls (and quick fixes)

  • “We PAT everything every 12 months” by default
    • Fix: Move to risk‑based intervals; save cost without compromising safety.
  • RCD push‑button tests get forgotten
    • Fix: Add to CAFM reminders; train local champions; label boards.
  • EICR actions not closed out
    • Fix: Track C1/C2/FI to completion; keep written evidence from your electrician.
  • No asset control
    • Fix: Use PAT asset lists to manage appliance lifecycle and prevent duplicate kit.
  • Poor scheduling
    • Fix: Bundle visits and plan out‑of‑hours testing for critical areas.

How All In One Pro PAT Testing can help: We deliver risk‑based PAT testing with minimal disruption, clear reporting and practical advice. Our team:

  • Tests offices, retail, hospitality, education, healthcare, construction and more
  • Provides asset registers, fail reports and labelling that auditors understand
  • Coordinates with your EICR contractor so you can close actions quickly
  • Offers out‑of‑hours and phased testing to suit live sites

Learn more or request a quote: https://allinonepropat.co.uk/pat-testing/

FAQs: Electrical compliance deadlines for facilities managers

Is PAT testing a legal requirement?

Not as a fixed timetable. The legal duty is to maintain equipment so it doesn’t cause danger. PAT is a proven way to evidence that you’re meeting that duty with a risk‑based regime.

How often should we PAT test our office?

Typical practice is combined inspection and testing every 24–48 months for IT equipment and 12 months for extension leads, with interim visual checks. Adjust based on risk and insurer requirements. Book PAT: https://allinonepropat.co.uk/pat-testing/

Do new appliances need PAT testing?

Brand‑new appliances don’t normally need immediate PAT, but they should be visually checked on arrival, logged, and tested at the next appropriate interval per your risk assessment.

How often should RCDs be tested?

Use the push‑button test typically every 6 months (or as the device label/manufacturer states). RCD performance is also verified during EICR.

How often is an EICR needed?

It’s risk‑based. Commonly 5 years for offices/retail and 3 years for industrial. For private rented homes it’s typically 5 years per national regulations. Your inspector will recommend the next interval.

What are the fire alarm and emergency lighting testing intervals?

  • Fire alarm: weekly user test; 6‑monthly competent service (some sites quarterly)
  • Emergency lighting: monthly functional test; annual 3‑hour duration test

Can PAT testing replace an EICR?

No. EICR covers fixed wiring; PAT covers portable appliances. You need both for a complete safety strategy. See our PAT service: https://allinonepropat.co.uk/pat-testing/

How long should we keep records?

Keep at least the current and previous EICR, plus all remedials. For PAT, keep records until the next cycle at minimum; many organisations retain 3–5 years for audits and insurance.

Who can carry out PAT testing?

A competent person with suitable training, equipment, and knowledge of the IET Code of Practice. Many organisations appoint a specialist contractor like All In One Pro PAT Testing.

+ + + + +

Make electrical compliance simple.
Align risk‑based PAT with your wider safety calendar and keep impeccable records.

How much is PAT Testing? Try Our PAT Calculator for and instant quote
})